A pipeline constructor asked to check and validate the design of PU spacers protecting a 3LPE (3-layer polyethylene) coating during the pulling of a pipeline section through a concrete tunnel. Furthermore, the section needed to pass the hydrotest.

Approach

First, the force profile needed to pull the section through the tunnel was calculated. Then, a detailed simulation of the total load distribution within and outside one spacer during pulling and hydrotest was made.
Finally, the introduction into the tunnel was simulated for the first spacers.

Results

As the calculated stress within all spacers remains below acceptable treshold during pulling and hydrotest, the spacer design was validated.

No problems accurred during the installation of the pipeline through the tunnel.

 