ECA Fitness for service
A subsea pipeline was plastically deformed due to accidents. The outcome was the validation of the engineering ciritcal assessment (ECA) with maximum defect size.
A subsea pipeline was plastically deformed due to accidents. The outcome was the validation of the engineering ciritcal assessment (ECA) with maximum defect size.
A pipe coater needed a more environmentally friendly surface treatment to replace its current chromate based solution. The MSC was asked to screen greener adhesion promotors enabling durable steel/fusion bonded epoxy (FBE) primer interfaces for 3-layer polyethylene (3-LPE) pipe coatings.
Using different in-house tools, initial friction tests were carried out on the coated metal components. 3D-roughness measurements were used to compare wear performance.
To use S355 steel plate for offshore applications, a full qualification is needed according to the appropriate standard EN 10225:2009. This standard specifies a whole host of investigations to be performed, from welding with pre-defined heat input levels and full testing of the welds to specific tests to assess the hardenability and cold cracking sensitivity.
A pipeline constructor asked to check and validate the design of PU spacers protecting a 3LPE (3-layer polyethylene) coating during the pulling of a pipeline section through a concrete tunnel.
The question was raised under which condition of weather and leg height, resonance of a jack-up barge could occur. A safe operational window to avoid lock-in of the legs was identified and critical conditions have been determined.
The stability of subsea pipelines, marine risers and offshore structures can be compromised by fluid-structure interaction. Vortex induced vibrations lead to fatigue of flow lines under free span and risers. It was possible to determine the loading pattern and compare it to the pipeline’s characteristics.
Fatigue analysis of a mid-size wind turbine hub at various load conditions was requested. Furthermore, a comparison between welded and cast hubs was needed. The computation demonstrated that it was possible to use a welded hub
Cost reduction is an important topic in the offshore wind sector. However, in view of the move to larger turbine sizes and deeper waters, costs of foundation structures will rise. It is now possible to test tubular joints having the dimensions of offshore wind turbine jacket structures at millions of cycles within a week and with low energy consumption.
As threaded connections are submitted to variable loading they can suffer from fatigue. The critical locations for fatigue were determined and confirmed by experiments. The large scale resonant bending test proved to be valuable test equipment.
Reeled pipelines are submitted to cyclic deformation during reeling and unreeling operations. The behaviour of the plastic deformed pipe needed assessment. The ultra-low cycle fatigue characteristics of the pipe were determined as well as the feasibility of the pipe to multiple bending cycles.